(a) setup time,
(b) work handling time,
(c) machine operation time
(d) machining time.
Time obsessive in setting of tools on turret lathe is identified as set-up time. It can be condensed through using correct tools in a good form.
The instant extreme in rising and remove the work piece is identified as work handling time. The time consumed in bring particular tools to cutting place is call machine handling time. A correct series of process reduce this time significantly. Time consumed in different process on a turret lathe is identified as machining time. It can be abridged by selection of suitable cutting tools, speeds, feeds with depth of cut.
To raise efficiency, it is needed that time taken in every of over operation be minimized.