Search This Blog

Ramming of Pattern Requiring Three Flasks

Ramming of Pattern Requiring Three Flasks Points : Ramming of Pattern Requiring Three Flasks, Using a lifting ring with a green-sand-core method, Green Sand Core Process, Three Part-Flask Process It depends upon the following three way:
1. Using a lifting ring with a green-sand-core Process
2. Green Sand Core Process
3. Three Part-Flask Process
1. Using a liftingRing with a Green-Sand-Core Method Third process of moulding a sheave wheel or comparable kind of pattern is very like to the green-sand core process. Specifically cast lifting ring is use to lift with handle the green-sand core. Whole mould by the pattern removed is comparable. Common procedure for making this type of mould, omit the thorough steps is as follows:
  1. Create the drag by the lifting ring with the drag half of pattern. It will be not possible to ram sand below the lifting ring, out this is not essential.
  2. Create the drag by the lifting ring with the drag half of pattern. It will be not possible to ram sand below the lifting ring, out this is not essential.
  3. Put the cope half of the pattern.
  4. Put the cope half of the pattern.
  5. Put the cope half of the pattern.
  6. Ram up the cope.
  7. Ram up the cope.
  8. Elevate the green-sand core by the lifting ring.
  9. Elevate the green-sand core by the lifting ring.
  10. Elevate the green-sand core by the lifting ring.
  11. Put the core for middle hole.
  12. Put back the cope by the mould is ready for pouring.
This process is proper for large moulds with also eliminate rolling the whole mould.
2. Green Sand Core Process A different process of moulding a sheave wheel or some similar-shaped pattern is call the green-sand-core process. This process uses the similar split pattern which was used over and a two-part flask by just the cope with drag The complete mould with the pattern removed is shown in Fig.1O.6. The general procedure for making this kind of mould, omitting the detail steps, is as follows:
  1. Create the cope by the cope halt of pattern. Gate and riser spur pins are use and detached.
  2. Roll-over the cope, cope down with create the first parting surface.
  3. Put the drag half of pattern.
  4. Pierce on sufficient sand to create the green-sand-core ram green-sand core by the ends of the fingers and by the heel of hand.
  5. Grate off the excess sand and create the second joint.
  6. Ram up the drag.
  7. Ram drag with draw the drag-half of pattern.
  8. Restore the drag.
  9. Roll above the whole mould.
  10. Take away the cope with draw the cope half of pattern .
  11. Put the core for middle hole.
  12. Return the cope with the mould is set for pouring.
In this process the delicate green-sand core cannot be handed by itself, except it is for all time support also on the cope or drag. This process is not proper for large moulds or for patterns of this type by deep grooves.
3. Three Part-Flask Process One process of moulding a sheave wheel or any comparable shaped pattern employs a three parts flash by a cheek. Completed mould with no the pattern removed. Split pattern is in use with core prints added to place with hold the core for the central hole. Some procedures can be followed while making this type of mould, but for this exacting mould the feasible procedure, omit thorough steps, is as follow:
  1. Create the drag using the drag partly of the pattern.
  2. Create the drag using the drag partly of the pattern.
  3. Create the drag using the drag partly of the pattern..
  4. Put the cope half of pattern with ram up cheek.
  5. Cope down and make the next parting surface.
  6. Cope down and make the next parting surface..
  7. Confiscate the cope and draw the cope half of pattern.
  8. Confiscate the cope and draw the cope half of pattern..
  9. Put the core used for central hole.
  10. Re-assemble mould for pouring.

No comments:

Post a Comment

Dont paste link here..